Flood Defence Bunds - Stoke Goldington

The village of Stoke Goldington was flooded during the summer of 2007 as a result MK Highways constructed a series of flood defence measures to help protect the village.

Following the flooding of Stoke Goldington MK highways engaged consultants to collect data and analyse what caused such devastating flooding and what measures were required to both improve drainage through the village and where necessary construct flood defences to protect in the future.

Following the report MK Highways designed solutions to the issues and undertook a series of projects which included ;

  • Constructing 7 flood storage bunds to store water in times of flood
  • Improving watercourse alignments to improve flows through the village
  • Replacing old 'stone' defective drainage systems to improve flows 
  • Installing additional gullies and upgrading surface water pipework to cope with floodwater
  • Cleaning and Jetting Culverts
  • Digging out existing ditches to increase capacity during floods

Latest news

MK Highways recovers over £400,000 in damage costs to highway assets

MK Highways has taken a pro-active step towards recovering damage to our assets caused by drivers on our roads.

more
MK Highways Awarded £2.271 million

Milton Keynes has been awarded £2.271 m grant by the Department for Transport who has identified that the funding should be directed towards repairing damaged roads, tackling potholes and repairs to bridges/structures.

more

To ensure we give you the best experience on our website we use Cookies. You can change your cookie settings at any time. However, if you continue without changing your settings we will presume you are happy to receive all cookies on the Milton Keynes Highways website.

Continue